Desert Rose Golf Course:

Excavation of earth and materials started Monday. Approximately 16,500 cubic yards of turf have been removed from the golf course to date.  Work presently underway within the golf course consists of low flow channel excavation, drainage pipe installation, top soil stripping, dewatering well and bypass line installation, and continued turf removal.

Haul Routes and Closures:

There are no anticipated changes to these haul routes at this time. Earthwork removal started on Monday with over 7,000 cubic feet removed to date.  There is no new additional traffic control planned for Sahara Avenue at this time.

City of Las Vegas Project within Vegas Valley Drive:

The City of Las Vegas has a concurrent project, not related to the Las Vegas Wash Project, under construction within Vegas Valley Drive.

Photos:

See photo’s during construction

11.12.13_Construction1.jpg
11.21.13_Construction2.jpg
11.26.13_Construction3.jpg
11.26.13_Construction4.jpg
12.02.13_Construction5.jpg